Home| About us| Pricing| Contact us| Career| MediaGallery| Technology&Resorces| Services| Partners|FAQ's

NoidaCity|Education|Classes|Doctors&Hospitals|Shopping|Articles|Videos|Photos|ENTERTAINMENT|Stores Jewels|Hotels&Resto|Property|Autoes|HealthClub|Services|News Paper&TV|TRAVEL|JOBS

AN INDIA CRICKET TEAM IS NO.1 and KOHLI IS ALSO NO.1 PLAYER | इंडियन आइडल में अपनी अकादमी खोल दिया है * | मोदी अगले चुनाव 2014 के लिए प्रधानमंत्री के लिए तैयारी कर रहा है * | केबीसी Winer इस मौसम के लिए रुपये 7crors जीत सकते हैं |AAP- AAM AADMI PARTY CHUNAV CHINAH IS CHHADU ..

Online News Channel- INDIA TV via Noida Next

Your Welcome to the World of AdsClinic Internet Marketing.
Ads Clinic is an one of the indias Leading Company in Mobile Marketing and internet Marketing.
We serve in Advertising industries from 2006 nd in Mobile nd Internet Marketing from Last 3years.


To Promote your Bussines / Event / News in NoidaNEXT please Mail us @ info@adsclinic.in or contact us 09540505454

Directories

Tuesday 5 November 2013

About Yamuna Express Way-Taj Express Way Delhi Noida to Agra


» Yamuna Expressway

picture
Welcome to Yamuna Expressway – The Expressway to the Future! India’s Longest Access Controlled Concrete Pavement Expressway –engineered and built to international standards byJAYPEE Group, along Yamuna river connectingNoida and Agra. With the commissioning of Yamuna Expressway, “The drive between Noida and Agra is never going to be the same again” as the 165 km long express corridor drastically reduces the travel time, making it the fastest mode of transport between these two cities, even compared to air travel (considering airport transfers & formalities).

» Jaypee Infratech Limited

Jaypee Infratech Limited (JIL) was incorporated on April 5, 2007 as a Special Purpose Vehicle (SPV) to develop, operate and maintain the 165 km long 6-lane Access-Controlled Yamuna Expressway in the state of Uttar Pradesh connecting Noida and Agra. The Expressway was awarded on BOT (Build-Operate-Transfer) basis by Yamuna Expressway Industrial Authority (YEIDA), to be executed with full responsibility for financing, land acquisition, design, construction, and operation & Maintenance. The construction of the Yamuna Expressway was carried out by Jaiprakash Associates Ltd., the flagship company of the Jaypee Group, setting a benchmark of sorts by completing the major works well before the schedule.
The Yamuna Expressway is located entirely in the State of Uttar Pradesh, with its first 41 kilometres being 
located in District Gautam Budh Nagar, passing Noida, Dankaur, Mirzapur and Jewar, followed by 18 
kilometres in District Aligarh, passing Tappal. The following 88.5 kilometres are located in District
 Mathura passing, Matt, Raya, Baldev & Mahaban (including 4.5 kilometres in District Hathras), followed by 
approximately 18 kilometres in District Agra, passing through Ramnagar Khandouli, Chhalesar Chaugan, 
Kuberpur, with the Expressway ending near Etmadpur, a village in District Agra.

» Facilities

Food Outlets:

  • Food outlets by popular brands:

Medical Emergency:

  • Round-the-Clock Medical Centre with consultancy room having stretcher & bed facilities, medical equipment and medicines at each Toll Plaza.
  • Fully equipped Medical Vans with trained medical staff, equipment and medicines - available on call.
  • Tie-up with major hospitals in Delhi/NCR, Mathura & Agra - for emergency treatment of accident victims.

On-Road Support:

  • Multiple Fuel Filling Stations - Six outlets (3 each on either side) to have ATM, small convenio, public convenience facilities
  • Field Fuel Dispensing Units including delivery of fuel – for the vehicles stranded with empty tanks.
  • Recovery / Crane service for haulage of broke-down/damaged vehicles


» Contact Us

Registered & Corporate Office

Sector 128
District Gautam Budh Nagar
Noida 201304
Uttar Pradesh,India
Call us:+91 120 4609 000
Toll free No:+91 120 4609 783
Fax:+91 120 4609 783
>Email:jpinfratech.investor@jalindia.co.in
FOR MORE DETAILS LOG ON TO


» Salient Features

SALIENT TECHNICAL FEATURES
TypeConcrete Paved
Length165.537 Km
Right of Way (ROW)100 m
Number of Lanes6 Lanes (extendable to 8)
Lane Width3.75m each
Top Width of Embankment47.60 Mtr. (including 6.0 Mtr. wide Median)
Height of Embankment1.50 to 7.0 Mtr. (varying)

NUMBER OF STRUCTURES
Interchange6 Nos.
Main Toll Plaza3 Nos (32 lanes at each location, extendable up to 52 lanes)
Ramp Plaza8 Nos
Vehicular Underpass70 Nos
Minor Bridge41 Nos
Cart Track Crossing76 Nos
Culvert183 Nos

PRINCIPAL QUANTITIES EXECUTED
Earthwork including Fly Ash411.1 Lac Cum
Concrete33.2 Lac Cum

MAJOR RAW MATERIAL CONSUMED
Cement12.0 Lac Tonnes
Steel1.30 Lac Tonnes
Stone Aggregate130 Lac Tonnes
Admixtures12,500 tonnes
Bitumen7,500 tonnes

LANDSCAPING
Shrubs Planted5 Lac (approx.)
Trees Planted5 Lac (approx.)
Grass Turfing62.70 Lac Sq.Mtr.

SPEED
Speed Limit for LMV100 Km/Hr
Speed Limit for HMV60 Km/Hr












No comments:

Post a Comment

Thanks for ur visit.Please visit again...

NoidaCity|Education|Classes|Doctors&Hospitals|Shopping|Articles|Videos|Photos|ENTERTAINMENT|StoresJewels|Hotels&Resto|Property|Autoes|HealthClub|Services|News Paper&TV|TRAVEL|JOBS
Home| About us| Pricing| Contact us| Career| MediaGallery|Technology&Resorces| Services| Partners|FAQ's